Sensitive excavation to remove all soil from tree stump to expose all existing underground services high voltage power, high pressure gas main, high pressure water main and storm water barrel drain to Install new footings for traffic signals. The footing excavated between all services at 0.6m diameter x 3.4m deep.
2Construct / Corner of City Rd & Southbank Blvd. Melbourne
Enviro Excavations acknowledge the traditional owners of the land on which we stand and the elders past and present.
ACCREDITED
OUR CLIENTS
© Copyright 2022 Enviro Excavations | Privacy Policy
All rights reserved. Powered by iseekplant.com.au
Fill out our online contact form for an obligation-free quote, or give us a call on (03) 9034 5899.